This page replays precomputed runs of the GENCO Operator Console for the bundled scenarios; to run GENCO live, see the GitHub repo (space/app.py).

GENCO Operator Console

This console shows GENCO, the GridFM grid foundation model, on IEEE 118 contingencies. After each Newton step, a calibrated bound on every monitored branch loading and PQ voltage decides whether the screening decision can be accepted. Otherwise the policy takes another step, and after three steps it falls back to a full solve. The same policy runs from the pre-contingency state for comparison. All safety evidence is empirical.

0 missed
violations in 16,449 held out, and 0 in 17,095 more generated after the rule was frozen, from a different load profile
37 to 44% fewer
factorizations than the same check from the pre-contingency state (IEEE 118, N-1 to N-5)
32 to 60x
gap between GENCO's reported power balance and the balance at the true slack-voltage setpoint (IEEE 14 to 118; about 20x on GOC 500 and 2000)
Contingency order (GENCO was trained on N-1)
Grid
Convergence
Violations: true AC vs each screen (flagged as violating, within limits)